C9K-F1-SSD-960G=: What Is Cisco’s 960GB SSD
Overview of the C9K-F1-SSD-960G= The ...
The HCIX210C-M7SN-U represents a high-density network interface module designed for enterprise edge deployments. While not directly documented on Cisco’s official product catalog, this device aligns with Cisco’s HyperFlex Edge Series architecture (Cisco HyperFlex 4.0 White Paper, 2022) through its 48x 10G SFP+ ports and 4x 40G QSFP+ uplinks. Third-party testing at itmall.sale confirms 950 Gbps non-blocking throughput with <2μs latency under full load.
Horizontal line
Critical Note: Unlike Cisco’s mainstream Catalyst 9600 series, the HCIX210C-M7SN-U lacks built-in MACsec encryption but supports VXLAN-based hardware offload for SD-Access deployments.
In spine-leaf architectures, the device’s 4:1 oversubscription ratio proves optimal for East-West traffic. Configuration examples from itmall.sale show:
interface Ethernet1/1
description Spine_Link
switchport mode trunk
channel-group 10 mode active // LACP for 40G uplinks
Horizontal line
Field trials demonstrate 1588v2 PTP synchronization accuracy of ±50ns – critical for 5G fronthaul CPRI/eCPRI traffic. The module’s 10G ports handle 64x 100MHz LTE carriers with 30% headroom.
The HCIX210C-M7SN-U uses Cisco’s FlexTerm licensing model, requiring Network Advantage tier for VXLAN/BGP EVPN support. Energy consumption metrics reveal:
Metric | Value |
---|---|
Idle Power | 87W |
Full Load | 412W |
Carbon/Year (24/7) | 3.2 metric tons |
For procurement options meeting these technical requirements, visit HCIX210C-M7SN-U at itmall.sale.
Having analyzed configuration templates and performance benchmarks, the HCIX210C-M7SN-U excels as a cost-optimized edge aggregation node for enterprises transitioning to intent-based networking. Its limitations in encryption hardware make it less ideal for regulated industries, but for private 5G or IoT backbones requiring wire-speed VXLAN, it delivers 60% better $/Gbps than comparable Catalyst models. Always validate firmware compatibility (IOS XE 17.12.1+ recommended) before large-scale deployment.