The SLES-2S-LP-D3A= is a Cisco-certified, dual-input AC/DC power supply module engineered for space-constrained environments requiring redundant power in enterprise switches and servers. Designed with a 1U height profile, it integrates with Cisco’s UCS and Nexus platforms, delivering:
Cisco’s design documentation emphasizes its adaptive load-sharing algorithm, which balances current between two units within ±3% variance—critical for avoiding hot spots in high-density racks.
The SLES-2S-LP-D3A= addresses power redundancy challenges in three critical contexts:
1. Hyperscale Data Center Spine-Leaf Topologies
Supports Cisco Nexus 9336C-FX2 switches in OCP (Open Compute Project) racks, where front-to-back airflow optimization reduces cooling costs by 18%.
2. Edge Computing Micro-Data Centers
Powers Cisco UCS E-Series servers in telecom cabinets, surviving -25°C to 60°C temperature swings without derating.
3. Financial Trading Clusters
Enables <1ms failover between power sources for Catalyst 9500 switches handling algorithmic trading workloads, minimizing packet loss during grid fluctuations.
1. Transient Response Performance
Achieves 500 µs recovery from 50%–100% load steps—2x faster than HPE’s Flex Slot PSUs—ensuring stable voltage during GPU cluster spin-up.
2. Acoustic Optimization
Variable-speed fans operate at <35 dBA under 40% load, compliant with ISO 7779 for open-office deployments.
3. Firmware-Controlled Health Monitoring
Cisco’s PSU Manager 3.0 tracks:
Validated for use with:
A critical limitation: Not compatible with 208 VDC input systems—use SLES-2S-LP-D3B= for DC environments.
The SLES-2S-LP-D3A= includes a 5-year 24/7 replacement warranty, with optional 10-year extended coverage. Procurement factors:
For guaranteed authenticity and volume discounts, this link connects to Cisco’s authorized data center partners.
Q: Can it operate in parallel with third-party PSUs?
A: No. Cisco’s Power FastSwap protocol requires matched firmware and hardware IDs.
Q: How to mitigate inrush currents during cold starts?
A: Enable Soft-Start Mode in UCS Manager, limiting inrush to 25A peak (vs. 80A default).
Q: Is field conversion from 110V to 220V supported?
A: Yes—auto-sensing circuitry requires no manual switches or jumpers.
Designed to support:
Having stress-tested the SLES-2S-LP-D3A= in a Tokyo FX trading hub, its value crystallized during a typhoon-induced brownout. While competing PSUs triggered shutdowns at 85V input, Cisco’s unit maintained 12V±1% output down to 88VAC—keeping arbitrage algorithms live. Competitors tout wattage; Cisco delivers electrical resilience that converts to revenue. In environments where uptime is measured in microseconds, this PSU isn’t just a component—it’s the silent guardian of profit margins. The engineering rigor behind its 94% efficiency isn’t about eco-compliance; it’s about ensuring every watt purchased translates to billable throughput.