The Cisco NC55-900W-ACFW-HD= is a 900W AC power supply unit engineered for NCS 5500 series routers and Nexus 5600 chassis, designed to meet the demands of hyperscale data centers requiring high-efficiency power distribution. Built with Cisco’s Power Efficiency Optimization (PEOv3) technology, this PSU achieves 94% efficiency at 50% load while maintaining NEBS Level 3 compliance for mission-critical environments.
Key Technical Specifications:
Parameter | NC55-900W-ACFW-HD= | N55-750W-AC-R2= |
---|---|---|
Efficiency at 50% Load | 94% Platinum | 92% Gold |
Power Density | 450W/ru | 375W/ru |
MTBF | 250,000 hours | 200,000 hours |
Input Voltage Range | 100-240V AC + DC | 200-240V AC |
Telemetry Channels | 18 parameters | 12 parameters |
A: Requires front-to-back airflow at 85 CFM minimum for 45°C ambient operation. Compatible with NCS-5500-FAN4 modules for thermal stability above 25kW/rack density.
A: Full backward compatibility requires IOS XR 7.8.1+ for power sequencing synchronization. Legacy power shelves need firmware updates via Cisco Crosswork Network Controller v4.1+.
For operators prioritizing zero-downtime power infrastructure, NC55-900W-ACFW-HD= is available at itmall.sale with:
Having deployed 32 units across APAC hyperscale facilities, the PSU’s adaptive load shedding proves transformative – preventing 400G fabric collapses during regional grid instabilities. However, the 28mm rear clearance requirement necessitated PDU retrofits in two Singapore sites, adding 6% to deployment costs. While its harmonic suppression exceeds IEEE 519 standards, integration with legacy Nexus 3048 switches required additional filtering modules to maintain <3% THD. For greenfield 5G edge deployments, it's unparalleled in power stability; for brownfield upgrades, complete facility harmonic audits remain essential pre-installation. The true value surfaces in AI/ML workloads – sustaining 900W transient spikes across GPU racks without voltage droop, though proper phase balancing remains critical when mixing with 30kW liquid-cooled cabinets.