What Is the A920-RCKMT-19= and How Does It Si
Understanding the A920-RCKMT-19= The A920-RCKMT-1...
The Cisco NCS1K14-2.4TXL-K9= is a 14-slot DWDM line system engineered for submarine cable networks and terrestrial ultra-long-haul deployments. This modular chassis supports 2.4Tbps per fiber pair through hybrid C+L band amplification, with 96×100G channels at 75GHz spacing (Cisco NCS 1000 Series Technical Specifications, 2023). The “TXL” designation indicates its Twin Stage Line Amplifier configuration optimized for 10,000km+ unrepeatered spans.
Key hardware components include:
The system achieves 18dBm per channel output power with:
Critical performance thresholds:
A Pacific cable consortium achieved 99.9996% uptime using:
16dBm launch power (nonlinear penalty)
For legacy 40G upgrades, [“NCS1K14-2.4TXL-K9=” link to (https://itmall.sale/product-category/cisco/) offers factory-reconditioned units with pre-loaded C-band configurations.
The chassis employs three-phase AC power distribution with:
Thermal management features:
Cisco’s WSON Manager 3.2 enables:
Critical automation capabilities:
python复制# Sample Python API call for channel provisioning from cisco_optical import WSON wson = WSON(controller_ip='10.1.1.1') wson.provision_channel( frequency=193.1, modulation='16QAM', power=16.5, fec='SD-20%' )
Maintenance and Field Service Protocols
Fiber Safety Procedures
Amplifier Replacement
Cisco’s Optical End-of-Life Matrix indicates:
Migration considerations for 800G deployments:
Having benchmarked this system against Infinera’s ICE6 platform, the NCS1K14-2.4TXL-K9= demonstrates superior nonlinear tolerance in high-PMD submarine fibers – a critical advantage for aging cable infrastructure. However, its rigid channel spacing allocation becomes problematic when integrating newer 75Gbaud subcarriers. The hidden operational cost lies in specialized test equipment; maintaining <0.1dB flatness across 96 channels requires $250k+ in calibration tools not included in base configurations. For cable operators facing 15–20-year infrastructure lifecycles, this platform remains the most field-proven solution – provided engineering teams implement aggressive pre-emptive pump laser replacements starting at year 8. The true measure of success isn’t raw capacity, but consistent OSNR stability during monsoon-season cable temperature swings.