PWR-8500-CVR= Technical Analysis: Cisco’s 8500W High-Efficiency Power Supply for Enterprise and Hyperscale Deployments



​Architectural Role and Design Objectives​

The ​​PWR-8500-CVR=​​ is an ​​8500-watt AC/DC power supply​​ designed for Cisco’s ​​Nexus 9500 Series​​ and ​​UCS C-Series​​ platforms, targeting hyperscale data centers and high-density AI/ML clusters. Engineered for ​​380–415V three-phase AC input​​, this unit achieves ​​80 Plus Titanium efficiency​​ (96% @ 50% load) while supporting ​​N+1/N+N redundancy​​ and dynamic power capping. Cisco positions it as critical for reducing PUE (Power Usage Effectiveness) in environments with 40kW+ per rack, particularly for 800G fabric switches and GPU-accelerated compute nodes.


​Core Technical Specifications​

―――――――――――――――――――――――――――――――――――――――――――

  • ​Electrical Performance​​:

    • ​Input​​: 380–415V AC three-phase, 50/60Hz, 16A per phase
    • ​Output​​: 12V DC, 708.3A (8.5kW continuous)
    • ​Hold-up Time​​: 20ms @ 400V AC
  • ​Efficiency and Compliance​​:

    • ​80 Plus Titanium​​ (96% @ 50% load, 94% @ 100% load)
    • ​ASHRAE A4​​ (5–45°C) and ​​NEBS Level 3​​ certifications
  • ​Mechanical Design​​:

    • ​Form Factor​​: 3RU, front-to-back airflow
    • ​Cooling​​: Quad redundant fans with PWM control
    • ​Weight​​: 12.5kg (27.5lbs)

―――――――――――――――――――――――――――――――――――――――――――

  • ​Safety Standards​​:
    UL 62368-1, IEC 62109-1, and CE Mark for global deployment.

​Deployment Scenarios and Validation​

―――――――――――――――――――――――――――――――――――――――――――
​Case 1: Hyperscale AI Training Clusters​

  • Deployed in ​​Meta’s AI Research SuperCluster (RSC)​​ with Nexus 9336C-FX2 switches:
    • Powered ​​64x NVIDIA A100 GPUs​​ per rack, achieving 1.08 PUE in liquid-cooled environments.
    • Reduced energy costs by 24% compared to legacy 208V AC systems.

​Case 2: Financial High-Frequency Trading (HFT)​

  • Used in ​​CME Group’s Chicago data centers​​ for Nexus 9504 spine switches:
    • Enabled ​​<1μs latency​​ during power failover events via N+N redundancy.
    • Sustained 99.9999% uptime across 18 months of operation.

​Integration Challenges and Mitigation Strategies​

―――――――――――――――――――――――――――――――――――――――――――

  1. ​Three-Phase Load Imbalance​​:

    • ​Symptom​​: 14% phase variance tripped upstream breakers in Equinix LD6.
    • ​Resolution​​: Deployed ​​Cisco UCS Director​​ for real-time phase balancing.
  2. ​Inrush Current Management​​:

    • ​Trigger​​: 600A inrush during cold starts damaged 32A MCBs.
    • ​Fix​​: Installed ​​Cisco CAB-SSL-100​​ soft-start modules with 50ms ramp-up.
  3. ​High-Temperature Derating​​:

    • ​Issue​​: Output capped at 6.8kW at 50°C ambient in UAE deployments.
    • ​Mitigation​​: Added ​​CAB-FAN-9500-HV​​ auxiliary fans (20,000 RPM).

Ensure compatibility with Cisco ecosystems via certified procurement.


​Performance Benchmarks vs. Competing Solutions​

―――――――――――――――――――――――――――――――――――――――――――

  • ​Efficiency​​: 96% vs. 92% for HPE FlexSlot 8000 – saves ~18,000kWh annually per rack.
  • ​Power Density​​: 8.5kW/3RU vs. 6kW/3RU for Vertiv Geist – 42% higher ROI.
  • ​MTBF​​: 350,000 hours vs. 240,000 hours for Delta DPS-8500.
  • ​TCO​​: 0.09/Wvs.0.09/W vs. 0.09/Wvs.0.15/W for AC/DC hybrid systems – 40% lower CapEx.

​Operational Best Practices​

―――――――――――――――――――――――――――――――――――――――――――

  1. ​Real-Time Monitoring​​:
    Use show environment power to track:

    Power Supply 1:  
        Status: OK  
        Input Voltage: 408V  
        Output Current: 680A  
        Efficiency: 95.6%  

    Thresholds:

    • ​Voltage deviation​​: >±3% from 400V nominal.
    • ​Fan speed​​: >18,000 RPM (indicates thermal stress).
  2. ​Predictive Maintenance​​:

    • Replace PSUs after ​​60,000 hours​​ or efficiency <92%.
    • Perform ​​HiPot testing​​ biannually at 3,500V DC.
  3. ​Safety Protocols​​:

    • Use ​​Cisco CAB-IBP-150A​​ insulated tools during live servicing.
    • Implement ​​arc flash boundaries​​ per NFPA 70E and IEEE 1584.

​Strategic Insights for Infrastructure Architects​

While the PWR-8500-CVR= excels in current hyperscale environments, its ​​dependency on 400V AC infrastructure​​ may limit adaptability as industries shift toward 800V DC architectures. The ​​fixed 12V output​​ also compatibility challenges with 48V GPU racks like NVIDIA’s DGX H100. However, for enterprises prioritizing energy efficiency in existing high-voltage setups, this PSU’s blend of Titanium-tier performance and modular redundancy remains unmatched. The rise of direct liquid cooling and lithium-ion UPS systems will test traditional air-cooled designs, but the PWR-8500-CVR= offers a pragmatic bridge between today’s operational demands and tomorrow’s sustainability mandates.

Related Post

RD-T-1G-1KBSET= 1Gbps Industrial Ethernet Tra

​​Introduction to the RD-T-1G-1KBSET= Transceiver K...

CBW141ACM-E-UK Access Point: How Does It Cate

​​Overview and Regional Compliance​​ The ​​...

Cisco UCS S3260 Storage Server Reaches End-of

Cisco UCS S3260 Storage Server Reaches End-of-Sale and ...