​​Technical Specifications and Compliance​​

The Cisco PWR-4430-AC= is a ​​4,430-watt AC power supply​​ designed for high-density data center and enterprise environments. Engineered to deliver reliable power with ​​94% efficiency​​ (80 PLUS Platinum certified), it supports critical infrastructure with the following specifications:

  • ​​Input Voltage​​: 200–240V AC, 50/60Hz
  • ​​Output​​: 12V DC, 369A max current
  • ​​Redundancy​​: Supports N+1, N+N configurations
  • ​​Compliance​​:
    • ​​NEBS Level 3​​ (GR-63-CORE seismic/vibration)
    • ​​UL 60950-1​​ (Safety)
    • ​​RoHS 3​​ (EU 2015/863)
  • ​​Environmental​​:
    • Operating Temperature: 0°C to 45°C (derate 2% per °C above 40°C)
    • MTBF: 250,000 hours (MIL-HDBK-217F)

​​Comparison with Previous Models​​

Parameter PWR-4430-AC= PWR-4KW-AC=
Efficiency 94% 92%
Redundancy Support N+1, N+N N+1 only
Output Ripple <50mV <75mV

​​Compatibility and Integration​​

​​Supported Cisco Platforms​​

  • ​​Switches​​: Nexus 9504/9508 with N9K-PUV4 chassis
  • ​​Servers​​: UCS C480 ML M5 (requires UCSX-PSU-4300AC= adapter)
  • ​​Routers​​: ASR 9904 with A9K-PWR-4KW= module

​​Third-Party Validation​​

  • Validated with ​​NVIDIA DGX A100​​ systems via Cisco UCS C-Series racks
  • Requires firmware updates for ​​Juniper QFX5200​​ (Junos 21.2R3+)

​​Installation and Redundancy Configuration​​

​​Step-by-Step Deployment​​

  1. ​​Safety Precautions​​: Ensure AC circuit breakers are locked out (NFPA 70E compliance).
  2. ​​Mounting​​: Slide PSU into chassis slot until latch clicks (tool-less design).
  3. ​​Power Redundancy​​: Configure via Cisco NX-OS CLI:
    power redundancy-mode combined  
    power supply 1 priority primary  

​​Thermal Management​​

  • Maintain ≥5cm clearance between PSUs for optimal airflow.
  • Monitor temperatures via show environment power (alarm triggers at 50°C).

​​Addressing Critical Deployment Concerns​​

​​Q: How does load balancing work across multiple PSUs?​​

  • ​​Dynamic Load Sharing​​: Automatically distributes load proportionally (e.g., 60/40 split during peak).
  • ​​Manual Override​​: Use power supply priority CLI commands for critical modules.

​​Q: What is the procedure during a PSU failure?​​

  • ​​Hot-Swap Replacement​​: Remove faulty unit within 2 minutes; replacement auto-syncs with existing config.
  • ​​Alerts​​: SNMP traps sent via Cisco UCS Manager or Nexus Dashboard.

​​Q: Mitigating harmonic distortion?​​

  • ​​Power Factor Correction (PFC)​​: 0.99 PF rating minimizes grid feedback.
  • ​​Deploy Active Filters​​: Use Cisco CAB-AC-FILTER= for environments with sensitive equipment.

​​Maintenance and Lifecycle Management​​

​​Firmware Updates​​

  • ​​NX-OS​​: 10.2(3)F+ for adaptive current sharing.
  • ​​UCS Manager​​: 4.3(1c)+ for predictive failure analytics.

​​End-of-Life Strategy​​

  • ​​Last RMA Date​​: Q3 2031 (Cisco EOL Notice #7845).
  • ​​Recycling​​: Separate aluminum heat sinks from PCBs per R2v3 standards.

​​Operational Insights from Healthcare Deployments​​
In a regional hospital’s data center, deploying 8x PWR-4430-AC= units reduced unplanned downtime by ​​92%​​ over 18 months. While 48V DC architectures gain traction, this PSU’s ​​N+N redundancy​​ ensured uninterrupted EHR access during grid fluctuations. The unexpected benefit? Its ​​low ripple output​​ (<50mV) eliminated data corruption in MRI imaging storage—proving that power quality directly impacts clinical outcomes.

For procurement and compatibility checks: [“PWR-4430-AC=” link to (https://itmall.sale/product-category/cisco/).

Related Post

UCS-MR-X64G2RW= Enterprise DDR4 Memory Module

Core Hardware Specifications The ​​UCS-MR-X64G2RW=�...

DS-C9710-FAN: Cisco\’s Advanced Cooling

What Is the DS-C9710-FAN? The ​​DS-C9710-FAN​​ ...

C9400-LC-48U++=: How Does This Line Card Addr

Core Functionality and Target Environments The ​​C9...