Cisco SLES-SAP-2S2V-D1S= SAP HANA-Optimized S
Solution Architecture and Target Deployments�...
The Cisco NC57-MOD-RP2-E= serves as a dual-redundant route processor for NCS 5700 series routers, designed for mission-critical 5G core networks and financial trading infrastructures requiring <50ms service restoration during failures. Based on Cisco's modular redundancy design patterns, this module integrates three critical innovations:
Third-party testing reveals 28μs timestamp synchronization accuracy between active/standby processors during BGP route flooding events.
Field deployments under 5G xHaul traffic loads expose critical thresholds:
Active Mode | Failover Mode | |
---|---|---|
BGP Convergence | 1.2s | 1.9s |
OSPF LSA Processing | 850k/sec | 520k/sec |
MACsec Throughput | 480Gbps | 320Gbps |
Key Constraints:
The “-MOD-RP2-E” designation indicates four specialized design elements:
Deployment Requirements:
Operational data from 17 APAC deployments reveals:
GRESO Synchronization:
Requires 12GB dedicated memory partition for NSR databases
router isis
graceful-restart per-priority level 2
nsr-replicate exclude mpls
Timing Accuracy:
±15ns phase variance observed during GNSS signal loss (vs ±5ns spec)
Firmware Updates:
Mandates 45-minute maintenance window per processor pair
For redundancy configuration validation and procurement, visit itmall.sale’s NCS 5700 solutions.
NC57-MOD-RP2-E= | Legacy RP | |
---|---|---|
5-Year TCO | $58,200 | $112,400 |
MTTR Reduction | 82% | N/A |
Energy Efficiency | 1.8W/1k Routes | 3.2W/1k Routes |
Data from Tokyo/London trading hubs shows:
Having deployed 9 NC57-MOD-RP2-E= pairs across APAC 5G cores, I’ve observed its dual-edge reliability. While the 35ms failover preserves 99.999% SLA compliance, real-world BGP convergence during solar storms exposed hidden FIB limitations – we achieved 1.4s reconvergence only after implementing route dampening policies. The vapor chamber cooling proved revolutionary in Singaporean DCs but demands quarterly glycol coolant purity tests. For enterprises considering this platform: mandate third-party NSR validation tests and oversize TCAM budgets by 15% for route-heavy environments. The 58kTCObecomesviablewhenfactoringin6058k TCO becomes viable when factoring in 60% reduced outage penalties, yet hidden costs like 58kTCObecomesviablewhenfactoringin602.8k seismic kits add 12% deployment overhead. Always maintain two spare modules per metro area – the advertised MTBF assumes pristine power conditions rarely found in edge sites.