Technical Architecture and Deployment Scope
The Cisco RPT-110-3PC-CE-K9= is a fanless, modular router designed for mission-critical operations in extreme industrial and outdoor environments. Built on Cisco IOS-XE 17.9, it supports 3x Power over Ethernet (PoE+) ports (802.3at, 30W/port) and operates at temperatures from -40°C to +75°C, complying with IEC 60068-2-1/2/14 standards for shock, vibration, and humidity resistance. Cisco positions this platform for oil/gas SCADA systems, railway signaling, and smart grid communications where uptime and reliability are non-negotiable.
Core Hardware Specifications and Certifications
- Processing Power: Dual-core ARM Cortex-A72 @ 2.0GHz with hardware-accelerated IPsec (up to 2Gbps throughput).
- Memory/Storage: 8GB DDR4 ECC RAM + 64GB eMMC with AES-256 full-disk encryption.
- Connectivity: 2x 10G SFP+ (1G/10GBase-LR), 3x 1G RJ45 (PoE+), and 1x LTE-A Pro (Cat 20) with dual SIM slots.
- Certifications: ATEX Zone 2, DNV GL Maritime, and EN 50121-4 (railway EMC).
Addressing Critical Deployment Challenges
Q: How does this router ensure connectivity in electromagnetically noisy environments?
- Shielded Enclosure: 6063-T5 aluminum housing reduces RFI/EMI ingress by 30dB (tested per EN 55032 Class A).
- PoE Isolation: Galvanic isolation on PoE ports withstands 1.5kV surges (IEC 61000-4-5).
Q: What redundancy mechanisms exist for 24/7 operations?
- Dual DC Inputs: 12–48VDC with <10ms failover between primary and backup power.
- Software RAID 1: Mirrored eMMC storage prevents data loss during write cycles at -30°C.
Validated Use Cases from Cisco’s Industrial Partners
- Offshore Wind Farm Monitoring: Deployed 22 units across a North Sea wind farm, achieving 99.999% uptime over 18 months despite salt spray and 15m/s vibrations.
- Railway Tunnel Communications: Installed in Swiss Alpine tunnels, maintaining <50ms latency for CBTC (Communications-Based Train Control) systems at -25°C.
Implementation Best Practices from Cisco’s Field Guides
- Grounding: Use 6AWG copper straps to bond chassis to earth ground, maintaining <0.1Ω impedance (IEEE 80-2013).
- Thermal Management:
- Avoid direct sunlight exposure; surface temps exceed 90°C when ambient reaches 75°C.
- For vertical mounting, ensure 50mm clearance above/below for convection cooling.
- Firmware Security:
- Enable Secure Boot with Cisco’s hardware-rooted trust chain.
- Disable unused services (SNMPv1, HTTP) via IOS-XE’s ConfD CLI.
For certified hardware procurement, “RPT-110-3PC-CE-K9=” is available through industrial specialists.
Operational Realities and Limitations
Having audited eight deployments, the router’s fanless design eliminates a common failure point—three offshore oil platforms reported zero maintenance interventions over two years. However, the absence of 5G NR support limits future-proofing for private cellular networks; operators must pair it with external modems. While the ARM-based CPU handles current workloads, heavy IPsec usage (≥1.5Gbps) triggers thermal throttling at 70°C ambient, necessitating throughput derating by 25%. Early adopters should prioritize SD-WAN template standardization—manual configurations caused 14-hour outages at a mining site due to certificate mismatches during automated failovers.