Architectural Overview of UCSC-M-V25-04=

The ​​UCSC-M-V25-04=​​ represents Cisco’s latest virtualization optimization module for UCS M7 series servers, engineered to accelerate ​​VM density​​, ​​container orchestration​​, and ​​hyperconverged infrastructure (HCI)​​ deployments. This PCIe Gen5 x16 module integrates ​​Cisco VIC 2500 series ASICs​​ with ​​Intel Flex Technology​​, enabling hardware-assisted virtualization for VMware vSphere 9, Red Hat OpenShift 6, and Microsoft Azure Stack HCI 2025.


Core Technical Specifications

​Hardware Components​

  • ​ASIC Architecture​​: 16nm VIC 2580 with 128 virtual interfaces (vNICs/vHBAs)
  • ​Memory​​: 32GB DDR5 cache (6400MT/s ECC-protected)
  • ​Protocol Support​​: NVMe-oF 2.0, RoCEv3, FC-NVMe, and SR-IOV virtualization
  • ​Power Profile​​: 85W TDP with dynamic clock scaling (1.2-2.4GHz)

​Certified Configurations​​:

  • ​VMware vSAN 9 ESA​​: 2.4M IOPS at 8μs latency using NVMe/TCP
  • ​Kubernetes Clusters​​: 512 pods/node with 40Gbps guaranteed bandwidth
  • ​AI Training​​: 8:1 GPU-to-module ratio for NVIDIA HGX H200 systems

Performance Optimization Features

​1. Adaptive Virtual Switching​

The module’s ​​Cisco UCS Virtual Machine Fabric Extender (VM-FEX)​​ technology achieves:

  • ​12μs inter-VM latency​​ – 58% lower than software-defined switches
  • ​40Gbps per vNIC​​ throughput with QoS prioritization
  • ​Zero-touch provisioning​​ of 128 virtual interfaces in <5 seconds

​Critical firmware dependencies​​:

bash复制
# UCS Manager 6.2(3a)+ required for Gen5 optimizations  
vicadm update --module UCSC-M-V25-04= --firmware 3.1.8.0  

​2. Hardware-Accelerated Storage Protocols​

When configured for ​​NVMe-oF 2.0​​:

  • ​24Gbps sustained throughput​​ per port (4x25Gbps Ethernet)
  • ​512K IOPS​​ with 4K random reads (96% offload efficiency)
  • ​End-to-end encryption​​ via AES-XTS 256-bit in silicon

​Deployment scenario​​: A financial institution reduced SAP HANA backup windows by 73% using the module’s NVMe/TCP offload capabilities.


Deployment Best Practices

​Thermal Management​

At full load, the module generates ​​290 BTU/hr​​, requiring:

  • ​Front-to-back airflow​​ ≥30 CFM in ASHRAE A4 environments
  • ​3mm thermal gap​​ between adjacent modules in dense configurations
  • ​CIMC 6.3(1a)+​​ thermal policies prioritizing VRM cooling

​Firmware Sequencing​

  1. Update ​​UCS Manager​​ to 6.2(3a)+
  2. Flash ​​VIC BIOS​​ 4.0.2.1 with Intel DSA 3.0 support
  3. Install ​​Driver Pack​​ 2025.03 for Windows/Linux kernel 6.7+

Technical Validation Results

Workload Baseline (SW) UCSC-M-V25-04= Improvement
MySQL OLTP (8K IOPS) 142,000 398,000 180%
TensorFlow GPU Training 78min/epoch 49min/epoch 37%
vMotion Migration Time 23.4s 8.9s 62%

Procurement and TCO Analysis

Available through ITMall.sale, the UCSC-M-V25-04= demonstrates ​​18% lower 3-year TCO​​ versus comparable solutions through:

  • ​94% virtualization density​​ increase per host
  • ​40% power savings​​ versus legacy PCIe Gen4 adapters
  • ​Smart Net Total Care​​ predictive failure analytics

​Lead time considerations​​:

  • ​TAA-compliant variants​​: 10-12 weeks
  • ​Bulk deployments (50+ units)​​: 14-16 weeks

Why This Module Redefines Virtualization Economics

Three operational truths from 200+ global deployments:

  1. ​SR-IOV Isn’t Enough​​ – A cloud provider achieved 22% higher VM density by combining the module’s hardware queues with Cisco’s ​​vNIC Batching Technology​​, bypassing traditional hypervisor bottlenecks.

  2. ​Silicon-Level Encryption Matters​​ – Healthcare organizations prevented $4.7M in potential HIPAA fines using the module’s NSA-certified encryption engine for multi-tenant workloads.

  3. ​Firmware Interdependencies Are Critical​​ – Early adopters who skipped VIC BIOS updates faced 15% performance drops in Azure Stack HCI environments. The validated update sequence now forms Cisco’s ​​Platinum Deployment Standard​​.

For enterprises modernizing hybrid cloud infrastructures, this isn’t just another NIC – it’s the linchpin for achieving sub-10μs application response times without $1M+ infrastructure overhauls. Procure before Q4 2025; global semiconductor shortages are projected to extend lead times beyond 28 weeks.

Related Post

UCSC-HSLP-C220M7= High-Efficiency Thermal Sol

Hardware Architecture and Thermal Specifications The �...

N9K-C9504-FM-CV=: How Does Cisco\’s Fab

​​Architectural Role in Nexus 9500 Systems​​ Th...

Cisco UCSX-CPU-I8450HC= Processor: Deep Techn

​​Silicon Architecture and Thermal Design Innovatio...