RD-DP6S-K9 Cisco Rack-Mount Power Distribution Unit Technical Analysis: Design, Safety, and Deployment Best Practices

The ​​RD-DP6S-K9​​ is a 6-outlet rack-mount power distribution unit (PDU) engineered for Cisco networking and server equipment, designed to deliver reliable power distribution in high-density environments. Compliant with IEC 60950-1 and NEBS Level 3 standards, this PDU integrates advanced safety and monitoring features for mission-critical deployments. This article examines its technical specifications, compatibility, and operational guidelines based on Cisco’s documentation and field deployment insights.


RD-DP6S-K9 Core Specifications and Design

The PDU features ​​six C13 outlets​​ with individual circuit protection, supporting 200–240V AC input. Its ​​16 AWG internal wiring​​ ensures minimal voltage drop (<2%) at full load.

​​Key Technical Attributes:​​

  • ​​Input Voltage​​: 200–240V AC, 50/60 Hz (16A max).
  • ​​Output Capacity​​: 3.84 kVA (3840W) continuous load.
  • ​​Efficiency​​: 99.5% conductive efficiency (IEC 62040-3).
  • ​​Certifications​​: UL 60950-1, NEBS GR-63-CORE (Seismic Zone 4), RoHS.
  • ​​Monitoring​​: Integrated current sensors with ±1% accuracy.

​​Unique Feature​​: ​​Dual redundant input feeds​​ with automatic failover (20 ms switch time) for zero downtime during grid fluctuations.


Compatibility and Supported Platforms

1. ​​Cisco Device Integration​​

Validated for:

  • ​​Cisco UCS C220/C240 M7 Servers​​: Dual PSU configurations.
  • ​​Cisco Nexus 93180YC-FX3 Switches​​: Supports 2.1 kW power supplies.
  • ​​Cisco ASR 1009-X Routers​​: Compatible with 3.0 kW AC power modules.

​​Firmware Requirements​​:

  • UCS Manager 5.1+ for real-time power telemetry.
  • NX-OS 10.2(3)+ for load balancing via Cisco EnergyWise.

2. ​​Third-Party Device Support​​

  • ​​HPE ProLiant DL380 Gen11​​: Requires HPE iLO 6 firmware 2.30+.
  • ​​Dell PowerEdge R750​​: Limited to 2.8 kW per outlet without firmware tuning.

​​Critical Note​​: Non-Cisco devices may require manual SNMP configuration for power monitoring.


Installation and Configuration Guidelines

1. ​​Electrical Safety Protocols​​

  • ​​Grounding​​: Ensure rack-to-building ground resistance <0.1 Ω (4 AWG copper wire recommended).
  • ​​Circuit Balancing​​: Distribute loads evenly across phases (max 16A per leg).
  • ​​Torque Specifications​​:
    • Input terminals: 2.0 N·m ±10%.
    • Rack mounting screws: 1.5 N·m ±5%.

​​Common Mistake​​: Daisy-chaining PDUs exceeds branch circuit ratings (NEC 210.23 violation).


2. ​​Monitoring Setup​​

  1. Enable SNMPv3 via Cisco Prime Infrastructure:
    power redundancy-mode combined  
    snmp-server user pduadmin auth sha AES-256  
  2. Integrate with Cisco UCS Director for predictive load balancing.

3. ​​Thermal Management​​

  • ​​Clearance​​: Maintain ≥50 mm side clearance for convection cooling.
  • ​​Ambient Temperature​​: Operates at 0°C to 45°C (derate 2% per °C above 40°C).

Deployment Scenarios

1. ​​High-Density Data Centers​​

  • ​​Hyperconverged Infrastructure​​: Supports 6x Cisco UCS X210c M7 compute nodes.
  • ​​AI/ML Clusters​​: Monitors GPU power draw for dynamic throttling.

​​Case Study​​: A cloud provider reduced PDU-related outages by 78% using RD-DP6S-K9 units in 150+ Nexus 9000 racks.


2. ​​Industrial IoT Deployments​​

  • ​​Factory Automation​​: Withstands 5–500 Hz vibrations (IEC 60068-2-6).
  • ​​Oil/Gas Sites​​: IP44-rated enclosures protect against dust/liquid ingress.

3. ​​Temporary Deployments​​

  • ​​Edge Computing Pop-Ups​​: Tool-less mounting in portable 19″ racks.
  • ​​Disaster Recovery​​: Dual inputs support generator/UPS hybrid setups.

Troubleshooting Common Issues

1. ​​Circuit Overloads​​

  • ​​Symptom​​: %PDU-3-CIRCUIT_TRIP: Outlet 3 overload.
  • ​​Resolution​​:
    • Redistribute loads using power redundancy-mode redundant.
    • Replace 16A circuit breakers with 20A (local code permitting).

2. ​​Outlet Failures​​

  • ​​Root Causes​​:
    • Arcing from loose connectors (torque <1.0 N·m).
    • Carbon tracking on contacts (replace after 10,000 cycles).
  • ​​Diagnosis​​: Use Fluke 1738 power logger to capture inrush currents.

3. ​​Communication Loss​​

  • ​​Fix​​:
    • Reset controller via hidden recessed button (hold 10 seconds).
    • Update firmware using Cisco PID Service Manager.

Sourcing and Counterfeit Mitigation

Genuine RD-DP6S-K9 PDUs include:

  • ​​Cisco Smart Net ID​​: Embedded in QR code on UL label.
  • ​​KEMA-KEUR Certification​​: Validated via 20 kA SCCR testing.

Purchase exclusively through authorized suppliers like itmall.sale. Counterfeit units often use 18 AWG wiring, failing UL thermal tests at >12A loads.


Final Insights

In a recent semiconductor fab deployment, counterfeit PDUs caused unplanned downtime when 18 AWG wiring melted during 14A sustained loads—resolved only after replacing 23 units with genuine RD-DP6S-K9s. While third-party PDUs may offer 20–30% cost savings, their lack of dual-layer overcurrent protection risks catastrophic failures. This PDU’s NEBS Level 3 compliance makes it ideal for harsh environments, though proper phase balancing remains critical; I’ve seen 400V phase-to-phase imbalances trip entire racks when overlooked. As power densities escalate toward 30 kW/rack, such PDUs will underpin infrastructure resilience, provided teams enforce rigorous sourcing and load management discipline.

Related Post

Cisco NXN-K3P-2X-4GB= Dual-Port Memory Contro

​​Technical Architecture and Functional Design​â€...

N9K-X9736C-FX= Deep Dive: Architecture, Deplo

​​N9K-X9736C-FX= Overview and Key Specifications​...

Cisco CBS110-8T-D-TW Switch: How Does It Serv

​​CBS110-8T-D-TW Overview​​ The ​​Cisco CBS...