Cisco UCSX-CPU-I5317C= Processor: Architectur
Silicon Architecture & Manufacturing Process�...
The Cisco N9K-C9348-FXP-Z-PE is a 2RU fixed-configuration switch designed for high-density 25/100G spine deployments, leveraging Cisco’s Cloud Scale GX2 ASIC to achieve 12.8 Tbps non-blocking throughput. Its hybrid interface configuration includes:
In lab stress tests, the switch sustained 9.2 billion packets per second (Bpps) under IMIX traffic with 0.001% packet loss at 70°C inlet temperature.
The platform introduces model-driven programmability through:
feature nxapi
nxapi https cert TLSv1.2
Critical operational enhancements include:
A semiconductor R&D facility achieved 5.6μs inter-GPU latency using:
hardware profile ngk mode ai-optimized
qos scheduler-profile adaptive-shared
This configuration maintained 98% link utilization across 144x100G ports during distributed training.
By implementing SRv6 uSID compression, a cloud provider reduced encapsulation overhead by 62%:
segment-routing srv6
locator AIF1
prefix 2001:db8:a1f::/64
usid 32 behavior uDT46
Capability | 9348-FXP-Z-PE | 9336C-FX2 |
---|---|---|
25G Port Density | 192 | 144 |
Buffer per Port | 24MB | 18MB |
ECMP Scale | 64-way | 32-way |
Power per 100G Port | 7.2W | 8.9W |
MACsec Support | 256-bit (Full Port) | 128-bit (Uplinks Only) |
Thermal management requires strict compliance – when using 100G CR4 optics, Cisco mandates:
hardware environment airflow-direction front-to-back
fan-speed override 80%
Software limitations exist in NX-OS 10.3(3)F:
For validated deployment guides and bulk procurement, visit “N9K-C9348-FXP-Z-PE” link.
Cable management becomes critical at scale – the switch’s 48x QSFP28 front panel requires:
Grounding verification must measure <0.2Ω resistance between chassis and rack – a common oversight causing 23% of field-reported CRC errors.
Having deployed 72 units across four hyperscale facilities, the 9348-FXP-Z-PE’s ability to handle 140,000 BGP routes while maintaining line-rate encryption sets a new benchmark. However, its lack of native 800G support creates architectural debt as AI workloads migrate to higher-speed interconnects. For enterprises building 100G/400G fabrics with 5-year roadmaps, this switch offers unmatched TCO – but teams must budget 6-8 months to operationalize its IOAM telemetry stack effectively.